Integration patterns
Withdrawal status
Reconcile an existing payout and explain a pending result without submitting another withdrawal.
On this page
Separate checks from confirmationReconcile an existing payoutKeep the customer answer specificConfirmations and cancellationImplement and verifyTrack an existing payout until its provider outcome is known. You need a stable withdrawal/provider reference and application services that own player verification and risk decisions. This pattern does not initiate payments, implement identity checks or decide risk policy.
Separate checks from confirmation
Define stages that validate the reference, read completed player verification, apply your risk decision, reconcile the existing payout and notify the player. Register them using the .NET or Java recipes.
Return a specific outcome and correlation reference from each stage. A terminal business rejection stops or enters your explicit rejection path; it must not enter an automatic retry loop. “OK” is not enough to establish that money moved.
Reconcile an existing payout
The confirmation handler always queries the existing payout reference. Classify its result before deciding what to do next:
| Provider outcome | Handler action | Evidence to keep |
|---|---|---|
| Confirmed | Record confirmation and allow notification | Confirmed reference and time |
| Definitively rejected | Stop or follow the rejection path | Support-safe reason |
| Pending | Return a classified transient condition; use bounded retries | Last check and next planned check |
| Timeout or lost connection | Query again with the same reference | Unknown outcome, not a claim of failure |
| Missing/inconsistent reference | Escalate for reconciliation | The discrepancy; do not create a replacement payout |
Use retry delays for bounded status polling. There is no general delayed-stage timer. For checks that must continue outside this run's retry window, implement periodic reconciliation through a schedule and a durable business backlog.
Keep the customer answer specific
Expose which checks completed, when the provider was last queried and whether another check is planned. A pending confirmation is distinct from a failed request. Do not describe an integration timeout as proof that funds were lost.
Confirmations and cancellation
Provider polling and human approval are different mechanisms. A status check executes a handler again; a WaitingForApproval stage remains parked until your application submits an authorized API decision. Use the approval contract, not an approval wait as an implicit provider-event subscription.
Cancelling a pipeline stops further orchestration and fences unfinished attempts. It does not reverse an external payout. Model any reversal as a separate authorized business operation with its own reconciliation rules.
Implement and verify
Test confirmed, rejected, pending, timeout and inconsistent-reference outcomes against a provider fake. For every retry, assert that the external payout reference stays the same and that no new payout is submitted. Also test exhaustion of the retry limit: it must leave a visible unresolved operation for the reconciliation/escalation path, not silently report confirmation.
Then repeat a pending-to-confirmed scenario through a local server and inspect attempts, logs and the final notification. A green stage or a successful unit test alone does not prove provider confirmation.